Warmly celebrate the completion of the installation and commissioning of the Guangxi Beihai project
2023-06-06
Source:This site
Views:1099
Recently, the installation and commissioning of the integrated prefabricated pump station in Guangxi Beihai project of Zhongda Pump Industry have been completed.
The integrated prefabricated pump station has a diameter of 3 meters, a height of 11.4 meters, a pump power of 37 kW, and a single pump flow rate of 250 meters ³/ h. Equipped with a pump lift of 30m, 3 pumps, inlet diameter of 600mm, and outlet diameter of 400mm.