Ningguo City Backup Water Source Relocation Project Water Pump Ship Project
Product Introduction: Project name:Ningguo Standby Water Source Relocation Project Water Intake Pump Boat Project
Way:
Configuration:
Cycle:
Range:
Size:
Quality:
- Overview
- Advantage
- Sales
- Characteristic
Project name:Ningguo Standby Water Source Relocation Project Water Intake Pump Boat Project
Address:Ningguo,Xuancheng,Anhui
Project purpose:Urban backup water source
Main technical parameters of pump station
Body size:18.7x9.9x1.3m
Unit configuration:3 units(2 for use and 1 for backup)
Single unit flow rate:460m3/h
Lift:31m
Power:75kW/set 380V
Control method:ship end/shore end,local/remote control
Connection method with shore:45 meter DN400 rocker arm connection